Kontakt

Paul Kadiks
Paul Kadiks
Head of Asset Management Netherlands & Belgium

Kontaktovať

Adresa

Saffier 300
3316 Dordrecht

Chcete viac podrobností?

P3 Dordrecht

Prime Distribution Location Near the Port of Rotterdam

The P3 Dordrecht is a high-quality logistics facility of 33,141 m², strategically located within the Dordtse Kil III business park. Positioned close to the Port of Rotterdam and directly connected to the A16 motorway, the property provides outstanding access to one of Europe’s most important logistics and industrial regions. Its location allows occupiers to efficiently serve both domestic and international markets.

Designed for Large-Scale Logistics Operations

The facility comprises approximately 33,141 m² of total space, including 28,924 m² of warehouse space, 2,225 m² of office space and 1,992 m² of mezzanine space. The modern building specification and efficient layout support a wide range of logistics, e-commerce and third-party logistics operations. Located within the established Dordtse Kil III business park, the property offers an ideal environment for occupiers seeking scalable and efficient distribution space near the Port of Rotterdam.

Focus on Sustainability

P3 Dordrecht combines a prime logistics location with strong sustainability credentials. The property benefits from an EPC A+++ rating, reflecting its high energy efficiency standards and future-ready building specifications. Its strategic position close to the Port of Rotterdam and direct access to the A16 motorway help optimise transport routes and support more sustainable supply chain operations.

Aktuálne voľné miesto

0 m²

Možnosť výstavby

0 m²

Voľné priestory

0 m²

Voľné kancelárie

Budovy

Budova Voľný priestor pre development Skladové priestory k dispozícii Kancelárske priestory k dispozícii Celková plocha BREEAM EPC LED osvetlenie Parkovacie miesta
1 0 m² 0 m² 0 m² 33 141 m² Very good A 229
Celkom 0 m² 0 m² 0 m² 33 141 m²

Základné informácie

  • Clear height: 12.2 m

  • Dock doors: 33

  • Level loading doors: 3

  • LED Lighting

  • Targeted power capacity: 1750 KVA

  • Contracted power capacity: 628 KW

  • Construction Year: 2017

Amenities

km od veľkého mesta

24

Náhľad detailu