P3 Zörbig

Modern Logistics Development in Zörbig

P3 is planning a logistics property of approximately 114,000 m² in Zörbig, Saxony-Anhalt. The site lies in one of Eastern Germany’s most industrialized regions and offers excellent connections: the A9 motorway and public transport are close by, and Leipzig Airport can be reached within a short time. The trimodal infrastructure makes the location highly accessible for regional and international distribution.

Flexible Space for Diverse Needs

The development is designed to meet the requirements of medium to large companies in retail, e-commerce, and light production. Construction is scheduled to start at the end of 2025 and will be realized in three phases. Each hall can be divided into several units, allowing flexibility for different operational setups.

Focus on Sustainability

The project aims for a BREEAM “Excellent” certification. Sustainable features include energy-efficient LED lighting, motion-sensor water taps with water-saving fittings, demand-driven lighting in busy areas, EV charging stations, and smart meters for optimized consumption. In addition, the roof will be prepared for a photovoltaic system to support renewable energy use.

Espace actuellement disponible

114 000 m²

Opportunités de développement

0 m²

Disponibilités

0 m²

Espace bureau disponible

Bâtiments

Bâtiment Espace de développement disponible Espace d'entrepôt disponible Espace de bureaux disponible Espace Total BREEAM EPC Eclairage LED Places de parking
1 114 000 m²  m²  m² 114 000 m² - - - -
Total 114 000 m² 0 m² 0 m² 114 000 m²

Information clé

  • Standard A+ class warehouse
  • Clear height: 12 meters
  • Load capacity: 7t/sqm
  • Single racking leg 10 T
  • Sprinkler system according to FM Global
  • 131 dock doors; 14 level loading doors
  • 475 car parking; 18 truck parking
  • BREEAM: Excellent
  • LED lighting
  • System Dali lighting system
  • Water taps with motion sensors
  • Motion sensors in most frequented rooms
  • Parking spaces for bicycles
  • Charging points for cars
  • Water-saving fittings on sanitary objects
  • PV ready Roof
  • Installation of a PV system on the roof areas as part of the development
  • Smart Metering

Aménagements

km de la grande ville

50

Stations-service

27

km

28

Galerie

Voir le détail