Located in the established industrial area of Seseña in the centre of Spain, this property is easily accessible to other prominent cities across the country. It is approximately 37 km south of Madrid, via the R4 and E5 motorways. Major companies in the area include Lidl, Artesolar and DHL.
The property was constructed in 2000, comprising a 30,422 m2 rectangular, standalone logistics unit. The building is constructed of precast concrete with a laminate metal façade.
Spain is the fifth largest economy in the EU, with a GDP in 2021 of €1.44 trillion and a per capita GDP of €30,949. Unemployment in Spain was 12.4% as of mid-2022. Industry makes up 20.4% the company, mainly the manufacture of textiles, industrial food processing, iron and steel, shop building and engineering. Spain’s biggest exports are vehicles and medical substances. The tourism sector is crucial for the country’s economy and is Spain’s main source of income. The country has borders with Portugal, France and Andorra. Spain’s highway network is the third largest in the world and is well integrated. The country’s geographic location makes it a transport hub to the Americas and north Africa.
Located in the established industrial area of Getafe in the centre of Spain, this park is easily accessible to other prominent cities across the country. It is approximately 19 km south of Madrid, via the A4/E5 and A 42 motorways. Major companies in the area include Seur, DHL, and Kuehne+Nagel.
The property was constructed in 2004, comprising a 14,502 m2 rectangular, standalone logistics unit, extensively fitted-out for cold storage purposes. The building is constructed of precast concrete with a laminate metal façade, 12.5 metre clear-height and 22 loading docks.
Located in the established industrial area of Getafe in the centre of Spain, this property is easily accessible to other prominent cities across the country. It is approximately 16 km south of Madrid, via the A4/E5 and A 42 motorways. Major companies in the area include DHL, TXT, and Kuehne+Nagel.
The property was constructed in 1999, comprising two separate zones - a high-clearance warehouse and separate cross-dock facility. The total GLA for the property is 30,917 m2, 1% of which is office space. The building is constructed of precast concrete with a laminate metal façade.