Rent a warehouse P3 Gottfrieding

0 m²
Available space
Space available for your business
0 m²
Development Opportunity
Area available for further development based on your needs
0 m²
Available office space
Total area of office space
55,200 m²
Total space
Total space of the park

About the park

P3 Gottfrieding is located in the economically strong district of Dingolfing-Landau and has a direct connection to the A92 motorway. Via the motorway junction “Deggendorfer Kreuz”, the crossing of the motorways A3 and A92, the site is connected to Nuremberg to the north and to Austria and the Czech Republic in the southeast. The B20 motorway, the second most important north-south connection in Bavaria, is nearby.


Key facts

  • Development in 2 phases
  • Total size: 55,200 m²
  • Clear internal height to roof beams: 10 m
  • Floor loading capacity: 5.0 t/m²
  • Column grid structure: 12 x 24 m
  • 1 dock leveller in load house every 1,000 m²
  • 1 level door per unit
  • Side loading ramps as option
  • Optional LED warehouse lighting
  • FM-Global sprinkler system
  • DGNB Gold Certificate

Others


Commercial contact